Free online tool for online sellers
Plan stock for products you sell as kits, bundles and single spare parts. Tell it what goes into each kit, and see what to order, when you will run short, and what it will cost.

When you sell a bundle, one sale uses several parts at once. Some of those parts are in other kits too, and some are sold on their own as spare parts. A simple stock list cannot see that, so you find out you are short of one small part after the kits are already sold.
This planner works the way replenishment planners do it in real supply chains: it breaks every kit into its parts (a bill of materials), adds the parts sold on their own, then compares the total need with your stock, open orders and shipments on the way, month by month.
Gift sets, craft kits, starter packs and bundles built from the same parts.
Subscription boxes, multipacks and product lines that share packaging or components.
Businesses that sell complete kits and also replacement parts on their own.
Set how many of each part go into one kit. Change a kit plan and every part updates.
See the month each part runs out, not just the total. Red means short.
Up to three shipments, each counted only from the month it arrives.
Orders round up to the supplier's minimum order quantity, with the total cost.
Worked out from average sales, lead time and safety days for every part.
How long stock lasts at past sales and at your forecast, in red, amber or green.
Part number, supplier, purchase cost, sales price, minimum order quantity, lead time and safety stock. Margin and reorder point are calculated for you.

Type how many of each part go into one kit. The planner shows each kit's parts cost and margin.

Stock on hand, open orders, and what is in each shipment on the way, with its arrival month.

Type how many kits you expect to sell each month. The planner shows what to order and when you will run short.

Built by a supply chain replenishment planner, based on the spreadsheet method used at work to restock kits and spare parts.
It is a stock planner for products you sell as a set of parts. You list which parts go into each kit (a bill of materials), and it works out how many of each part you need for the kits you plan to sell, plus any parts you sell on their own.
Yes. The planner is free to use. You sign in with Google so your data is saved online and stays private to you.
Reorder point = average daily sales × (lead time in days + safety stock in days). Average daily sales is your average monthly sales divided by 30.
Yes. Add up to three shipments of goods in transit and pick the month each one arrives. Each shipment only counts as stock from its arrival month, so the month-by-month shortage stays realistic.
Yes. Each part has a loose sales per month figure for spare parts sold on their own. The planner adds them to the kit demand and shows a separate spare-parts shortage.
Yes. If a supplier has a minimum order quantity (MOQ), the order is rounded up to the next full MOQ and the order cost is worked out from your purchase price.
Yes. The Download for Excel button saves your planner as a CSV file that opens in Excel or Google Sheets.
Only you. Your planner is linked to your Google account. We only use your name and email to sign you in.
Free, private to you, and it comes with example data so you can see how it works first.
Start free with Google